TAIPEI METRO FLOOD PROTECTION PROJECT

Taipei Metro Flood Barrier Projects

TIANSHUI contributed flood barrier manufacturing and installation to multiple Taipei Metro locations, with configurations tailored to station entrances, opening conditions, pedestrian circulation, and existing site constraints.

2018–2022 · Phased Works 26 Stations & Related Facilities 100+ Flood Barrier Units
METRO PROJECT EXPERIENCE

Flood Protection Across Multiple Metro Stations

Station entrances vary in opening dimensions, existing structural details, circulation patterns, and available clearance. A single standard barrier configuration cannot address every location.

TIANSHUI planned, manufactured, and installed flood barriers to suit the conditions and operational requirements of individual stations. Swing-type systems were configured as single-leaf, double-leaf, or folding gates where appropriate, balancing flood preparedness with everyday station access.

This page presents selected completed station installations, a folding flood gate operation video, and on-site installation records from Ximen Station.
26
Stations & related facilities
100+
Flood barrier units
2018–2022
Work completed in phases to meet station requirements

Taipei Metro — Referenced Locations

Project records cover metro entrances, underground shopping areas, depots, and associated facilities.

Jiangzicui Station Taipei Main Station · Exit M8 Shandao Temple Station Longshan Temple Station Songshan Airport Station Jiannan Road Station Zhongxiao Xinsheng Station Zhongxiao Fuxing Station Zhongxiao Dunhua Station Dazhi Station Taipei Nangang Exhibition Center Nangang Software Park Station Tucheng Station East Metro Mall Neihu Depot Sanchong Elementary School Station Xinpu Station Haishan Station Fuzhong Station Huilong Station Jiaojiu Operations Control Center Xiangshan Station Dahu Park Station Nanjing Sanmin Station Chiang Kai-shek Memorial Hall Station Ximen Station
TAIPEI METRO PROJECTS

Selected Taipei Metro Installations

The following images document selected completed metro installations. Each location uses a configuration suited to its opening, existing structures, available operating space, and flood protection requirements.

SWING FLOOD GATE CONFIGURATION

Gate Configurations for Different Metro Entrances

Swing flood gates can be configured according to opening width, door-swing clearance, storage position, and daily passenger circulation requirements.

01 / SINGLE LEAF

Single-Leaf Swing Gate

A single swinging leaf configured around the opening dimensions and available side clearance.

02 / DOUBLE LEAF

Double-Leaf Swing Gate

Leaves installed on both sides of the opening, suited to wider openings or situations where the swing space needs to be divided.

03 / FOLDING

Folding Swing Gate

Multiple leaves fold together; the arrangement can be customized around storage space and operational requirements.

ACTUAL OPERATION

Folding Flood Gate — Operation Video

In addition to flood protection, metro entrances require consideration of daily passage, gate operation, and side storage clearance.

This video documents the actual opening and closing of a folding swing flood gate at a metro station, showing deployment, folding, and storage to the side.

XIMEN STATION · ON-SITE INSTALLATION

Ximen Station — On-Site Installation Records

These photographs document flood gate installation at Taipei Metro's Ximen Station, from positioning and welding components, adjusting compression hardware, and checking alignment to fitting EPDM seals and completing final inspection.

Taipei Metro flood barrier project photograph
01
POSITIONING & WELDING

Component Positioning and Welding

Gate components were positioned at the installation location and the related parts were welded and secured.

Taipei Metro flood barrier project photograph
02
COMPRESSION MECHANISM

Compression Mechanism Installation

Compression hardware was installed and adjusted to align components and confirm their operating movement.

Taipei Metro flood barrier project photograph
03
HARDWARE ADJUSTMENT

Fastening Hardware and Adjustments

Connecting hardware and related components were fastened and checked for correct positioning.

Taipei Metro flood barrier project photograph
04
ALIGNMENT

Leveling and Operation Check

Gate leaves were aligned and leveled, and opening/closing movement and mechanisms were checked.

Taipei Metro flood barrier project photograph
05
EPDM SEAL INSTALLATION

Gate Leaf and EPDM Seal Check

Gate leaves were installed, with EPDM seal positioning and contact surfaces checked.

Taipei Metro flood barrier project photograph
06
FINAL CHECK

Completed Installation and Final Check

The assembled flood gate was completed and a final on-site check was carried out.